Client Name:
Konecranes Finland
Project:
Unloading, Shifting, Erection and Re-shifting of 3 Nos. RMG Cranes
Timeline:
Delivered within the scheduled timeframe
Movement and Erection of 3 RMG Cranes at DPW Mumbai (NSICT)

Client Overview:

Konecranes is a globally recognized leader in material handling solutions. Known for setting industry benchmarks, the company delivers advanced lifting equipment and services across multiple sectors, with a strong focus on safety, innovation, and sustainability.

Movement and Erection of 3 RMG Cranes at DPW Mumbai (NSICT) Movement and Erection of 3 RMG Cranes at DPW Mumbai (NSICT)
Project Challenge:

PORTECH was entrusted with executing the complete unloading, erection, and re-shifting of three 350-ton Rail Mounted Gantry (RMG) Cranes within the confined spaces of DPW Mumbai (NSICT). The complexity involved:
• Performing precision erection in a highly constrained operational yard.
• Relocating partially dismantled 40-meter structures from the wharf area to the erection site.

Solution Delivered:

PORTECH delivered a technically advanced, multi-phase solution:

• Movement Using SPMT:
Each 350T RMG Crane was safely moved from the erection yard to the operational site using a Self-Propelled Modular Transporter (SPMT), ensuring controlled movement and structural integrity across a 200-meter path.

• Heavy Component Transport:
Dismantled crane structures were transported using multi-axle heavy lift trailers, allowing secure and timely relocation of oversized components for final assembly.

project project
Results:

• Project delivered within the scheduled timeframe
• Executed with zero safety incidents
• Maintained high standards of precision and workmanship throughout

project project