Client Overview:
Established in 1999, Water Services Infrastructure Pvt. Ltd. (WSIL) is a key player in turnkey port equipment solutions across India and globally. With decades of experience serving government bodies, multinational corporations, and OEMs, WSIL is renowned for its technical expertise in complex port machinery projects and customized manufacturing.


Project Challenge:
The project involved the high-stakes erection of a 40-ton electrical room at a height of 20 meters, using a hinged locking mechanism for structural integration. The primary challenge lay in:
• Managing the weight and elevation during real-time port operations
• Achieving millimeter-level alignment to secure the hinged locking system under unpredictable site conditions
Solution Delivered:
PORTECH addressed the challenge with a high-precision, safety-first approach:
• 300-Ton Mobile Crane Deployment: A heavy-duty crane was mobilized to lift and position the 40T electrical room accurately at the 20-meter elevation.
• Customized Locking & Rigging Systems: Specialized rigging arrangements and custom locking mechanisms ensured exact alignment and secure placement of the structure.
• Expert Supervision & Safety Protocols: Every stage, from lift planning to final integration, was carried out under expert supervision, following rigorous safety standards.


Results:
• Safe and flawless execution of a critical lift
• All commissioning parameters met or exceeded client expectations
• Crane delivered in full operational readiness, on time and without incidents
• Reinforced PORTECH’s reputation for technical precision and safety excellence
Conclusion:
This project at Kakinada Port showcased PORTECH’s capability to handle high-complexity crane erection operations with engineering finesse, exacting safety, and reliable delivery, solidifying its role as a trusted execution partner for mission-critical port infrastructure.