Client Name:
Fuji Electric India
Project:
Dismantling, Shifting, Retrofit, Re-erection & Hybridization of 2 Nos. RTG Cranes
Timeline:
Delivered within the scheduled timeframe
Dismantling, Shifting & Hybridization of 2 RTG Cranes at GTI & HTPL

Client Overview:

Fuji Electric India, a subsidiary of global leader Fuji Electric, is a key player in energy and automation solutions. With one of the most extensive service networks in the country, the company supports diverse industrial and infrastructure sectors through its advanced technologies and engineering excellence.

Dismantling, Shifting & Hybridization of 2 RTG Cranes at GTI & HTPL Dismantling, Shifting & Hybridization of 2 RTG Cranes at GTI & HTPL
Project Challenge:

The project demanded precise dismantling and movement of two 250-ton Rubber Tyred Gantry (RTG) Cranes while facing logistical and regulatory hurdles:
• Damage-Free Dismantling:
Each crane had to be dismantled with utmost precision, ensuring complete preservation of structural and mechanical components.
• Logistical Obstructions:
During transportation, temporary roadblocks caused by local authority restrictions posed coordination challenges, requiring swift planning and communication to avoid delays.

Solution Delivered:

• Heavy Lift Transport:
Dismantled RTG structures were moved from JNPT port to HTPL CFS, Panvel, using multi-axle heavy lift trailers. This ensured secure handling of the oversized loads and protected critical components during transit.
• On-Site Re-erection and Hybridization:
Post-transport, the cranes were retrofitted and re-erected at the new location with full technical compliance and functional upgrades.

project project
Results:

• Project delivered on schedule
• No structural or mechanical damage during dismantling or transport
• Maintained seamless coordination with authorities to overcome logistical barriers
• Executed with high safety and quality standards

Conclusion:

PORETCH successfully executed a complex retrofit and relocation operation, showcasing its deep technical capability, on-ground coordination strength, and commitment to operational excellence in crane handling and infrastructure logistics.